HomeServicesProjectsAboutContact Get a quote

Revive Eco Park

ProjectRevive Eco Park
LocationLisheen, Co. Tipperary
TypeIndustrial
SheetSHT 05 OF 16
StatusAs built
DrawnFCE
Off-grid · First in Ireland
2 · Portal frames
SuDS · Surface water

Assigned Certifiers for the construction of Ireland's first off-grid industrial building, at the National Bioeconomy Campus on the former Lisheen Mine. The building runs without a water grid connection, drawing supply from two wells on site with its own wastewater treatment, and takes its power from 68 solar panels and 200 kWh of battery storage backed by an HVO generator. The portal frame was designed as two separate structures, dividing the administration block from the industrial building, so the two could be treated separately for fire certification. Fire Safety and Disability Access Certificates were prepared and taken through the local authority, alongside the on-site surface water and foul drainage design.

StructuralAssigned CertifierFire SafetyDisability AccessDrainage & SuDS